EV Charger Installation Blacktown
A home charger on its own protected circuit, with Endeavour Energy's requirements met and any supply upgrade done by our accredited Level 2 team.
5.0Google reviewsAn EV charger installation in Blacktown is often one of the easier jobs we do, but not always. A new house in Schofields or Stanhope Gardens with a double garage right next to the switchboard is quick. A 1960s fibro or brick home in Lalor Park, Seven Hills or Doonside, with its original meter box on the front wall and the car in a carport out the side, needs more care. Either way, we check the supply first so the charger isn’t loading a board or cable that can’t cope.
We’re licensed electricians and an accredited Level 2 team. If the supply needs work before the charger goes in, we do that too.
Older homes and newer estates
Blacktown has two very different housing stocks. The post-war suburbs were built with small single phase supplies, many still with their first meter board. These homes often need a board or mains upgrade before a charger is a good idea.
The newer estates in the north of the area are usually supplied underground from a pillar in the front yard, with a modern board and room for a new circuit. In those homes the job is mostly about the cable run and the charger location.
Where we put the charger
In a garage, we mount the charger on the wall nearest the car’s charge port. In a carport or driveway, we use an outdoor-rated unit on a wall or post with the cable protected in conduit. Western Sydney summers are hot, so we keep the unit out of direct afternoon sun where we can, which helps the electronics last.
When the supply needs an upgrade
A 7 kW charger draws as much as a big ducted air conditioner, and it does it for hours. On older homes that can be too much for the original consumer mains. A consumer mains upgrade gives the house a cable sized for modern loads.
If you want faster charging or the house is already running ducted air, a pool and an induction cooktop, a three phase power upgrade might suit you better. We lodge the Endeavour Energy application and do the network work ourselves.
Old fuse boards can’t take a new circuit with RCD protection. A switchboard upgrade is often done on the same day as the charger.
Rules we follow
NSW allows single phase chargers up to 32 A, around 7 kW. Higher-current chargers need to support demand response and meet the notification rules, and any install that needs a bigger connection needs Endeavour Energy’s approval first. We check the charger you’ve chosen and lodge whatever your install needs.
Charging on solar
Blacktown has a lot of rooftop solar. A charger that tracks your solar can fill the car during the day with power you’d otherwise sell back cheaply. We set it up to suit whether the car is home during the day or only overnight.
How long it takes
Installs in newer homes usually take a few hours. Older homes needing a board upgrade take most of a day.
Get a quote
Call your level 2 electrician Blacktown team for a fixed price on a charger. We install across the area, from level 2 electrician Quakers Hill and Kings Langley to Rooty Hill and Mount Druitt.
Updated
What good ev charger installation looks like
EV Charger Installation across Blacktown
EV Charger Installation in Blacktown: step by step
- Check the supplyWe look at your meter, board and existing load, and whether your home is fed overhead or underground.
- Fixed quoteOne written price for the charger install and anything the supply needs first.
- InstallThe charger goes on its own circuit with a breaker and safety switch, and we lodge what Endeavour Energy requires.
- Hand overWe test, set up the app or schedule with you, and give you the compliance certificate.
Related services
Three Phase Power UpgradeUpgrading a single-phase home to three phase power for EV chargers, ducted air conditioning, pools and big renovations.
Consumer Mains UpgradeReplacing old, undersized or VIR consumer mains between the meter board and the network connection.
Switchboard UpgradeOld fuse boards and asbestos meter panels replaced with a modern switchboard and safety switches, power isolated and restored by our own Level 2 team.
EV Charger Installation questions in Blacktown
Something else on your mind? Call 0468 449 776 and ask.
My house is in a new estate. Is a charger simple to add?
Usually. Newer homes in Schofields, Riverstone and Stanhope Gardens tend to have a modern board and the garage close to it. We still check the supply capacity before installing.
Do I need to tell Endeavour Energy?
Endeavour Energy requires an application when a charger means the supply has to be upgraded, and higher-current chargers need to meet the current NSW notification rules. We check which applies to your install and lodge it.
Single phase or three phase charger?
A 7 kW single phase charger suits most households. If your home is already three phase, an 11 kW charger is an option. We'll explain what your supply can take.
Can the charger work with my solar?
Yes. Many chargers can follow your solar output so the car charges on your own power during the day.